This is for the information of applicants who have given their consent for admission: Due to Sunday additional 24 hours will be given to them for the payment of fee. Fee Slips will be generated on Monday 9am onwards.
Category: daily-announcement
For admission related queries, issues and doubts
Cut Off for BA Semester III Honours
Roll No details of BCom 2 year, BCom 3 year students
Quotations Notice-INS Accredited Advertising Agencies
SEALED QUOTATION ARE INVITED FOR FOLLOWING WORKS UP TO 5TH July, 2020 :-
1. Providing and laying factory made champherd CC paver blocks 60mm thick M35 strength including 50mm coarse sand base as per specification including raising of man hole covers etc. and dismantling for leveling of base surface. The above item includes surface preparation and laying of paver blocks complete as per direction of engineer in charge.
Area: 3200sqft in block A & B, Hostel
2. Providing and laying factory made champherd CC paver blocks 60mm thick M35 strength including 50mm coarse sand base as per specification including raising of man hole covers etc. and dismantling for leveling of base surface. The above item includes surface preparation and laying of paver blocks complete as per direction of engineer in charge.
Area : 4800sqft in block C & D, Hostel
Specification of Work:-
1. 60mm thick paver blocks of M35 grade should be of approved make, Colour, Design, Pattern and should be factory made.
2. The Rate of Item includes the raising of man hole covers, drain covers if any. Nothing extra shall be paid for the same.
3. For maintaining required levels of paver blocks, any dismantling required included in items.
4. Work shall be carried out as per CPWD specification and as per instruction of engineer in charge.
5. Payment shall be made after complete satisfaction of work.
6. Time period for completion of work is 30 days from date of order.